Lincolnwood Pedestrian + Bicycle Bridge

Muller2 provided full architectural services, including contract documents and construction administration, for the design of the Lincolnwood Pedestrian & Bicycle […]

Posted April 5th, 2022 by Dana Hlubek
READ MORE

Navy Pier Flyover Lakefront Bike Path

Muller2 provided conceptual and detail design of all elements for the new Navy Pier Flyover elevated lakefront path. The new […]

Posted December 28th, 2021 by Francisco Lasta
READ MORE

US 12 Pedestrian Bridge

M2 is providing conceptual and detail design for a new pedestrian bridge that will replace an aging and functionally obsolete […]

Posted September 23rd, 2021 by Francisco Lasta
READ MORE

Wells Street Bridge

Muller2 worked with the Chicago Department of Transportation to rehabilitate the architectural elements on the 1922 Wells Street Bridge over […]

Posted May 20th, 2016 by Dana Hlubek
READ MORE

Solidarity Drive Underpass

Muller2 provided architectural conceptual design, detail drawings, and construction services for a new underpass and modified turnaround at Chicago‚Äôs Museum […]

Posted May 20th, 2016 by Dana Hlubek
READ MORE

Streets for Cycling Plan 2020

Muller2 worked as a consultant to Sam Schwartz Engineering (SSE) for the CDOT Streets for Cycling Plan 2020. The Plan […]

Posted May 20th, 2016 by Dana Hlubek
READ MORE

Museum Campus Station

The new Museum Campus Metra station is incorporated into the new 11th Street pedestrian bridge as part of a comprehensive […]

Posted March 22nd, 2016 by Cate Muller
READ MORE

North Avenue Bridge

Muller2 provided conceptual and detail design, through construction administration for this new Chicago River crossing. In keeping with the City […]

Posted February 29th, 2016 by Muller Administrator
READ MORE

Halsted Street Bridge

Muller2 worked in collaboration with H.W. Lochner, Inc. Structural Engineers to replace the 1908 Halsted Street Bridge over the Chicago […]

Posted February 23rd, 2016 by Muller Administrator
READ MORE

Morgan Street Elevated Station CA

Muller2 provided architectural services for the construction phase of the new Morgan Street Green and Pink Line Station located along […]

Posted February 13th, 2016 by Muller Administrator
READ MORE