Metropolitan Pier and Exposition Authority / McCormick Place Roof Replacement
Muller2 provided full architectural services for the complete removal and replacement of the existing 525,600 square foot roofing system of the McCormick Place North Building, consisting of the main exhibit hall building and the crate storage building. The existing original roof system has been in place for approximately 30 years and is at the end of its useful life. Design of a replacement roof will include consideration of the following aspects: Building and energy codes, code review to determine if elimination of smoke hatches would comply with the Chicago Building Code, and a structural review to determine the effects of proposed roof systems on the existing structures.  
Metropolitan Pier and Exposition Authority
McCormick Place Roof Replacement
Chicago Department of Aviation / O’Hare Airport Terminal 5 Roof Replacement
We provided full architectural services for the removal and replacement of the roof at O’Hare International Airport’s Terminal 5 building. The existing 391,841 square feet roof system was removed and recycled, as were the existing pavers, while the majority of the roof insulation was reused. A sheet metal flashing roof was installed, and additionally 2012 square feet of the Terminal 5 roof has been converted into a Green Roof, with a fully adhered PVC roof system.
Chicago Department of Aviation
O’Hare Airport Terminal 5 Roof Replacement