M2 is serving on the Owner’s Representative Team for the Chicago Transit Authority’s massive $1.8B Red Purple Line Modernization Project, as a sub-consultant to T.Y. Lin International. This is one of the largest Design-Build Projects in the nation. M2 led the production of bridging documents for the passenger station portion of the project, which includes the complete replacement of four existing stations. This included the development of station plans, specifications design guidelines, and fix design criteria. M2’s services will continue on during the final design and construction phases as Owner’s Representative for the stations component.